/*Menu hide on click outside*/
Published
7. February 2021
Expires
27. February 2021
Location
Denmark
Category
City
Denmark
Page Views
2

Description

Offshore Commissioning Instrument Lead

05-Feb-2021
Workplace location
ESBJERG-BRITANNIAVEJ(DNK)
Job Description
Appetizer

Are you interested in joining the Tyra Redevelopment Project’s commissioning execution phase offshore? Do you have a desire for ensure good preparation and execution of Commissioning for all Instrumentation within the project scope? If yes, then this position might be your match!
Key Responsibilities

As Offshore Commissioning Instrument Lead in the Commissioning team, you will be able to shape and develop a central role for the loop testing and SIL validation offshore campaign with the CSC and all Vendors associated. This is with the possibility to continuously learn and develop your competencies, participating in the preparation of Offshore Commissioning Schedule and Planning. You will get to use your knowledge and experience applying a range of techniques being the leader for the follow-up of execution of operational tests and give the support to other OTPs as far as your discipline is concerned.

Overall, you have the responsibility of safe preparation & execution of commissioning activities for his discipline, in line with the COMPANY Methodology, Standards and Project Specifications and Schedule.

These areas of responsibilities will include tasks such as:
HSE responsibilities:

Be a Champion for HSE during Offshore Execution, leading by example,Follow-up on the implementation of CPY HSE Policy and Procedures;Actively participate to the HSE meetings and lead TRA’s meetings as required;Make sure the execution of the activity is done in line with the work permit and be committed to stop any unsafe acts;Report any anomaly, unsafe act for further analysis and propose corrective actions;Ensure that all personnel under your supervision is acting as per all points mentioned aboveHold un updated instrument set point as well as an updated RLMU for your discipline along the project life till the safe handover to the end userIn charge of PTW preparation and opening on site for your discipline tasks

As a leader in his/her discipline, he/she is involved in the following tasks:

Before sail away, you shall be fully aware of the status of all subsystems at sail away point of time in particular (all instrumentation tasks performed at yard and the pending ones, yard CFTP status and close-out, final punch list status at sail away and carryover works) Liaise with CSC instrumentation team to prepare the required planning, PTW, procedures and test sheets to perform the instrumentation tasks in line with the offshore planning and commissioning sequenceMake sure with the HU team that PSVs are certified in due timeWith the vendors and ICSS team, ensure optimized packages loop testing including the interface with the ICSSMonitor the progress and notify the Commissioning Engineer when all instrumentation tasks achieved for each subsystemReview and validate the subsystems pre-commissioning and commissioning dossiers Closely follow the punch list related to his discipline and plan for closureMake sure that all risk assessment of the instrumentation tasks is prepared and implemented on siteEnsure that all personnel mandatory trainings for your team are performed and validManage the commissioning spare parts and incite any emergency material requestCoordinate with the instrument engineers in the different topsides to make sure that all instrument tasks are being performed safely and on timeCoordinate with the third party for the witness and required documentation for safety and critical element Responsible for instrument/metering vendors onsite (planning for mob/demob, day-to-day follow up and KOM/close-out meetings/reports)Part of reviewers/issuers of any TQ withing Commissioning.Take the necessary measures to achieve safe and proper energization on site for each new equipment with/without vendorsPart of the Field Black start for instrumentation side.
The position is based on a 3x3 rotation basis (3 weeks offshore, 3 weeks time-off)
Offer ID
38137BR
Country

Denmark
Candidate profile
Who we are looking for

It is important that you possess a safety mindset and address the job with a strong understanding of the business and people. Naturally, you thrive in a highly independent and visible position in a free and dynamic working environment. Also, excellent interpersonal and communicative skills are essential when being able to communicate and to work with all company and vendor personnel. We are looking for a strong team player with the ability to build relationships and work constructively with others to achieve business goals.
Your background

10 years of experience in Oil & Gas Projects as Commissioning Instrument SpecialistOffshore works experience, North Sea experience is plus,Able to communicate and to work with all COMPANY and Vendor personnel,Fluent in English,Hands on and computer literate (Standard software’s). Good knowledge of Commissioning Methodology OPERCOM and DatabasesHands on with PIMS-CMS is a plus.Proficiency in oral and written English
Contact

For HR related questions regarding this position, please contact Recruitment Partner, Kaj Lund on +45 40 24 57 96.For the position/job related questions, please contact Commissioning Manager, Guillem Coste on +45 21 32 11 75.
Metier

Upstream Operations
Job Title

Offshore Commissioning Instrument Lead
Branch

Exploration and Production
Functional discipline

Operations/Exploitation
Experience level required

Minimum 10 years
Employment type

Fixed term position
Context and environment

Tyra Redevelopment Project (TRP) Greenfield scope of work consist in the upgrade of an existing offshore field in order to extend its lifetime and production. Its new facilities mainly consist of:

4 WELLHEAD PLATFORMS TOPSIDES (TE & TW)2 RISERS PLATFORM TOPSIDES (TE & TW)1 CENTRAL PROCESS PLATFORM TOPSIDES (TEG)1 LEAVING QUARTERS PLATFORM TOPSIDES (TEH)NEW JACKETS FOR TEG & TEH

Main EPC Contracts have been awarded to:

McDermott: Process Platform (Kuala Lumpur - Malaysia / Batam - Indonesia)SMOP: WHRP's (Singapore)Rosetti: LQ (Milan / Ravenna - Italy)

The responsibility of Mechanical Completion and Commissioning of TRP will be split between EPC Contractor (onshore) and CPY (offshore). EPC CTR’s are responsible for execution of onshore Yard Commissioning as well as for the preparation of required Commissioning procedure for Onshore execution Phase (Engineering).

CPY remain responsible for the Offshore execution phase, including the preparation of the database and procedures, and for the supervision of Engineering by EPC and Onshore Phase execution in the yards. The following contractors are the selected for the offshore commissioning campaign:

ISC (Esbjerg- Denmark): in charge of offshore database preparation and WHRP Commissioning Functional Testing ProcedureCommissioning Service Contractor: who will be selected first quarter 2021 to support for the offshore commissioning and author the remaining procedures (TEG, integration of all other topsides). DNV: will continue as a third-party certification authority for the entire project.

The Project installation is staggered such that the HUC&W campaign is divided mainly into three phases. The perimeter of the RSES will evolve according also to the various HUC phases as depicted below.

Phase 1: Cold HUC with TE WHRP and TEH living quarter installed both in islanded mode.

Phase 2: Cold HUC with TEG installation and TW WHRP (remote) installation, including well reinstatement.

Phase 3: Hot commissioning (SIMOPS) and first gas export until end of ramp-up, including well’s unsuspension.

Related Jobs

19. December 2020
19. December 2020
19. December 2020